Avonmouth Wind Turbines

Bristol

Over a period of a few years, Rob, Alex and Chris worked together at WSP on the infrastructure design for proposed wind turbine schemes at three discrete sites in Avonmouth, Bristol. Rob was WSP's Project Director for work on all three of these projects.

Alex prepared outline designs and specifications for the on-site infrastructure along with a preliminary construction programme while Chris undertook Flood Risk Assessments including Sequential and Exception Tests to be included as part of the Environmental Impact Assessment to support the Planning Applications.

It is good to see all of these turbines are now installed and operational.