"We are working with AWP on pre-planning work and detailed infrastructure design on a number of our projects. We like their technical expertise and proactive culture and also their ability to work as part of a team whilst giving their best advice."

Philip FryManaging DirectorC G Fry & Son



We undertook a Flood Risk Assessment, a Foul Drainage and Utilities Strategyand provided engineering input into the masterplanthat Grainge Architectsdeveloped for this scheme of 93 dwellings in Chagford. The scheme also included the relocation of the existing Chagford Fire Station. We also undertook a preliminary highway designto support the detailed planning application made by CG Fry.

One of the key constraints to the development was the minor watercourse which flows through the middle of the site. We worked closely with Devon County Council in their role as Lead Local Flood Authority to make space for this watercourse and the proposed SuDS attenuation ponds. Care was taken to integrate the watercourse into the masterplan as part of a 'blue / green corridor'. The masterplan evolved through an extensive consultation programme which included Roband Danattending a very well supported public consultation event.

A huge amount of effort was made to provide the level of detail that enabled Dartmoor National Park Authority's Planning Committee to unanimously grant planning permission subject to S106 agreement.

We have recently completed the detailed infrastructure designand obtained the necessary technical approvalsin advance of construction work starting on site. This development really should make a positive contribution to providing much needed housing in this beautiful Devon town.