Back to projects

"Comer Group has had a long established reliance upon the AWP team to provide the multi-disciplinary engineering and environmental input that is vital to our development strategy. AWP engage fully with our in-house engineering department and are able to draw upon a depth of engineering experience that we have found to be equal to every project within our portfolio."

Robert SheppardPortfolio ManagerComer Group www.thecomergroup.com

Mast Quay

Woolwich, London

Mast Quay is a luxury 22 storey development of 2 and 3 bedroom riverside apartments with panoramic views of the River Thames, together with 740sqm of commercial space.

We have been appointed by long-standing client Comer Homes to assist with the Reserved Matters Application and to contribute towards the discharge of planning conditions relating to matters of surface water drainage. Our input includes engagement with both the London Port Authority and the Maritime Management Organisation over the proposed flood defence scheme associated with the development and also with Thames Water and the Royal Borough of Greenwich, as part of the South East London Flood Risk Management Partnership, to prepare a suitable scheme for the management and disposal of surface water runoff.

Image reproduced courtesy of Comer Homes